NEU SOLAR PRODUCTION FACILITY, ALGIER
PROJECT | New solar production facility, Algier |
OWNER | CEEG – Société Nationale de l’Electricité et du Gaz or Sonelgaz, Algerien |
CLIENT | Kinetics Germany GmbH, Eschau |
ARCHITECT | UNIT4 GmbH & Co. KG, Stuttgart |
TYPE OF USE | Production facility with technical areas, hazardous substance areas, gas farm, gatehouse and administration |
SERVICE U4 | Feasibility, conceptual, Basic design incl. design field assistance |
DATA BASE | GFA: 43.000 m² / BRI: 320.000 m³ |
TIME | 2011 |
LOCATION | Algier |
PICS | UNIT4 GmbH & Co. KG |
Construction of a fully integrated solar production facility with technical and administrative buildings, gas farm, gatehouse and hazardous goods warehouse in Algiers, Algeria. In addition to the high demands on the national earthquake regulations, special building dynamics regulations had to be taken into account to ensure the highly sensitive production and calculated according to the Eurocode. Intensive coordination with the associated national office for earthquake security and environmental protection took place.