CHEMICAL HAZARDOUS GOODS WAREHOUSE, ARNOLDSTEIN
PROJECT | Chemical hazardous goods warehouse, Arnoldstein |
OWNER | Kinetics Germany GmbH, Eschau |
CLIENT | Kinetics Germany GmbH, Eschau |
ARCHITECT | UNIT4 GmbH & Co. KG, Stuttgart |
TYPE OF USE | Industrial hazardous materials warehouse |
SERVICE U4 | Design phases 1-2 acc. HOAI |
DATA BASE | NF: 8.766 m² / BGF: 11.395 m² / BRI: 41.390 m³ |
TIME | 2012 |
LOCATION | Arnoldstein / Österreich |
PICS | © UNIT4 GmbH & Co. KG |
Design concept study for the expansion of the storage capacity through the construction of a new hazardous goods storage facility with rail connection in Villach/ Austria.